Laserfiche WebLink
REQUESTED COUNCIL A�T(QI� <br />1) Motion authorizing Change Order # 1 in the amount of $108,204.60 for the <br />brine piping replacement and re-insulation <br />2) Motion authorizing Change Order # 2 in the amount of (-$2,388.00) for <br />replacement of safety valves, brine pump #2, relief valve replacement and <br />a deduct for the Brine replacement cost due to the Univar/Dow Chemical <br />Donation <br />3) Motion authorizing Change Order # 3 in the amount of $6,727.40 for the <br />brine pump electrical work, flow switch replacement, shaft seal repair, and <br />expansion tank air vent replacement <br />4) Motion authorizing Change Order # 4 in the amount of $891.62 for the <br />replacement of the three way ammonia valves on the chiller <br />5) Motion authorizing Change Order # 5 in a deduct amount of (-$3,084.02) <br />for liquidated damages <br />6) Motion authorizing the final closeout for this phase of the OVAL chiller and <br />related repairs project as outlined. <br />