My WebLink
|
Help
|
About
|
Sign Out
Home
2006_0710_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2006
>
2006_0710_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 9:33:12 AM
Creation date
8/26/2009 3:37:32 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />DATE: 7110106 <br />ITEM �� �. ,�i ,� <br />DepartmentApproval: Manager Reviewed: Agenda Section: <br />� <br />- �r�� <br />_� <br />� <br />Item Description: Final Acceptaalce of the Public Improvez�ents constructed as Outlined in the <br />Public Improvement Contract for STONECREST <br />Background: In March, 2003, construction began on the placement of grading, utilities, curb <br />and gutter and streets for STONECREST. The area is located between Fulham Street and Marion <br />Road, north of County Road B. The owner of the property, Masterpiece Homes, was under <br />contract with F.M. Frattalone, Excavating and Grading, Inc. to perform the grading, utilities and <br />streets. The work was completed in July 2005 and the final documents were recieved in May <br />2006. The owner and the contractor have agreed about final payment and the owner is now <br />requesting that the City Council accept the utilities, curb and gutter and streets for maintenance <br />purposes. <br />Policy objectives: City Policy requires the following steps be completed to finalize the <br />construction project: <br />X Certification from the civil engineer in charge of the proj ect verifying that all work has been <br />completed in accordance with the City of Roseville's plans and specifications. <br />X A resolution by the City Council accepting the project and beginning the one-year warranty <br />period <br />Financial implications: The work performed on this site was by a private developer without any <br />direct cost to the City. The developer, Masterpiece Homes, is responsible for any payments for <br />work completed by subcontractors. <br />Staff recommendation: All necessary items have been completed in accordance with project <br />plans and specifications. Since all items have been completed as outlined in the policy regarding <br />final project acceptance, staff recommends the City Council adopt a resolution accepting the <br />utilities, streets, and curb and gutter as constructed in STONECREST. <br />RECOMMENDED COUNCIL ACTION: <br />Adopt a resolution acceptingthe public improvements constructed as outlined in the public <br />improvement contract for STONECREST. <br />Prepared by: Debra Bloom <br />
The URL can be used to link to this page
Your browser does not support the video tag.