My WebLink
|
Help
|
About
|
Sign Out
Home
2006_1127_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2006
>
2006_1127_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 4:28:06 PM
Creation date
8/26/2009 3:41:14 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.6 By authorizing distribution of the AUAR update, the RGU is determining the AUAR Update <br />"complete and accurate (EQB Guidance Document)."In making this determination, the <br />RGU is in essence approving the AUAR Update. If no objections are filed, the RGU is <br />required to adopt the AUAR Update. <br />2.7 During the ten-day public comment period, organizations and the general public that are not <br />afforded the ability to "object" under Minnesota Rules, can provide comments to the RGU. <br />If the RGU receives such comments on the draf� document during the ten-day review period <br />it is up to the City Council to determine how to tal{e those comments into consideration. If <br />such comments are integrated into the draft document and represent a significant change in <br />the analysis or the mitigation plan, the City would need to consult with the EQB and <br />potentially redistribute the document for a second round of agency review. <br />3.0 SUGGESTED ACTION: <br />3.1 By resolution, determine that the Twin Lakes Business Park AUAR Update is complete and <br />accurate and authorize its distribution to the organizations on the �Q�'s EAW distribution <br />list for the required ten-day objection period. <br />3.2 If the Council does not determine that the document is complete and accurate, and therefore <br />determines not to distribute the AUAR Update at this time, table the discussion for a later <br />meeting and provide staff direction on specific incomplete or inaccurate information in the <br />document. <br />112706 AUAR Update Document Distrif�uCioi� Authoriaatian Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.