Laserfiche WebLink
� <br />� <br />� <br />c] <br />� r7 <br />II <br />I} <br />I? <br />I� <br />IS <br />I ra <br />1- <br />I� <br />The proposed condo and town home developments are required to connect to Roseville <br />sanitary sewer and water mains. In the case of sanitary sewer, a lateral extension to serve <br />both the 43 unit condo and the 6 town home units must be designed to adequately serve <br />these structures. The General Concept Plan indicates these laterals as being extended <br />from existing service in the McCarrons right-of-way for the condo and from the Elmer <br />Street right-of-way for the town homes. Final plans must be reviewed and approved by <br />the Public Works Department. Similarly, a water lateral will be sized appropriately and <br />extended to each of the developments. A storm water management plan and wetland <br />protection will be required. The submitted plan included a buffer strip around the <br />wetland for added protection and a small pondiinfiltration area adjacent the church <br />parking lot and McCarrons Boulevard. Staff has been discussing the options of creating <br />an infiltration swale along Elmer Street, in the existing easement and drainage route, to <br />effectively handle run-off from this sit� as well at the church and armory parking lots. <br />The remaining utilities, such as electricity, cable, telephone, and natural gas, will be <br />designed and coordinated through the Public Works Department to be underground, and <br />utilize a joint trenching system where applicable. <br />I t� The condominium structure is "�," shaped to fit better with the southern site and the <br />'ta wetland, with the majority of the structure having a presence along the wetland and <br />} 1 western property line. 43 underground parking spaces are proposed. Mr. Paschke <br />� � explained the setbacks, site parking, height and proposed materials of structures. He <br />'_� noted that the cozadoininium parcel will be rezoned to Planned Unit Development (PUD) <br />�' � with an underlying zoning of R-3, General Residence District. <br />?� <br />�.C� <br />�;� <br />�� <br />� L� <br />;i�� <br />� <br />�} <br />yy <br />3� <br />y3 <br />Thomas Paschke also explained the townhoines which will consist of a single structure of <br />6 units fronting on Elmer Street. The town home unit will be either a rambler look-out or <br />walk-out depending on the location and site grade. The parcel has a highpoint near the <br />northeast comer and slopes approximately 9 feet in a southwesterly direction to the <br />wetland. Units may include a porch, deck, and/ar patio depending on final design and <br />proximity to the wetland. Each unit will have 2 garage parking stalls. He explained the <br />materials, setbacks, and parking and shared access. These 6 units and the associated land <br />will be rezoned to Planned Unit Development (PUD) with an underlying zoning of R-6, <br />Townhouse District. <br />� r� Thomas Paschke explained that the proposed grading plan is currently being reviewed by <br />��' the Capital Regions Watershed District and the Roseville Public Works Department. A <br />� x handout of the concerns of the Watershed District (dated January 31, 2005) was <br />��� distributed at the meeting. Storm water management practices must be implemented for <br />�� this redevelopmentproject to control the rate of storm flow discharge and eliminate a <br />� ; percentage of phosphorous. <br />�� <br />�� The submitted landscape plan that includes a mix of deciduous, coniferous, and perennial <br />��' plants. Specifically, the proposal includes boulevard trees adjacent to both Elmer Street <br />�� and McCarrons Boulevard; numerous coniferous tr��s (evergreen) along the east and <br />�C� west side of the condominium structure to screen and break-up the building mass; and <br />Page S <br />