My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0314_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0314_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 2:13:47 PM
Creation date
9/14/2009 9:59:57 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 6— Evaluate the Feasr"bfli�r of Connecting the RSVC Arena to the John Rose Oval's <br />Refrigeration System. <br />If this option is selected the evaluation will be performed between Steps 2 and 3 listed above. <br />During this step we will: <br />■ Evaluate the feasibilityof connecting the RSVC ice rink floorto the John Rose Oval's refrigeration <br />system. <br />* Write a letter report including and discussing the following: <br />c. A general description of the two facilities (RSVC Arena and the Oval) and the refrigeration <br />demand requirements including evaluating the existing refrigeration capacity of each <br />facilities and the required refrigeration capacity if the two facilities are combined. <br />:� Evaluation of physical obstacles such as the distance between the Oval's refrigeration <br />system and the RSVC Arena and its effect on system e�fc'senc� and construction costs. <br />.- Evaluation of seasonal demands on the common refrigeration system including <br />determining if the Oval's large refrigeration system can adequately and efficiently serve a <br />sing�e ice sheet application during the summer months. <br />;;� Estimate of probable construction costs for the piping connection between the Oval's <br />refrigeration system and the RSVC Arena and ail required modifications to the Oval's <br />refrigeration sustem to accommodate this addition. <br />. U :� �'I 1:� �xislu�? ��'r�;'rig�r�rvi r ����r �r� �u�rt��=wirtr'h� RSV� <br />� and ����nr±�a�a�� � ��r�remen� r� r�pra�e��t �p�on� rn�i� <br />improvem�n�s l�f �� e��g package �� slem, ���k � a��Is�� r <br />re�a�;�`7e�1 1�1� � :I ���1�`r1_ Eshn��[� �# p�a�aGd� p8+1�tr�tpiCri ��rs9s �r� �' <br />the options discussed will be provided. This information will allow the City to evaluate all <br />of the optionsfor renovating the RSVC ice rink floorand equipment. <br />•- Estimate of probable construction costs for the ice rink floor replacement in the RSVC <br />Arena with a like direct systern design and an indirect system design. <br />` Review the findings and cost estimates with the City. <br />If the option of serving the fwo facilities with a common refrigeration system is determined feasible and <br />the City approves this option we will provide the City with a revised design proposal to include this <br />change based on the determined scope of the project. If the Giy approves other recommended <br />improvements to the RSVC Arena w� will pr�w� th� City with a revised design proposal based on the <br />scope of the pro�ect(s}. <br />Mr. Lonnie Brokke, Director of Parks and Recreation <br />January 26,2005 Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.