My WebLink
|
Help
|
About
|
Sign Out
Home
2005_0321_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2005
>
2005_0321_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 2:06:04 PM
Creation date
9/14/2009 10:00:21 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 3- Final Documents and Assist with Bidding <br />A�er we have reviewed the report with the City we will: <br />� Prepare final design documentsincluding drawings and specifications for the Oval's chiller renovation <br />and refrigeration system improvements. Specificationswill include general project conditions, <br />construction contract, form of agreement between the City and the contractor, bid proposal <br />requirements and forms, and technical sections. The documents will include an alternate bid item for <br />replacing the existing chiller vessel with a new vessel. <br />Provide a final estimate of probable construction costs. <br />Provide recommendations on bidding and award schedule. <br />� Answer questions during the bidding phase of the project. <br />�e present at bid opening <br />Review bids submitted by the contractors <br />� Recommend award of contract. <br />Prepare construction contracts for review by the City. <br />Step 4 - Construction Services <br />We will pr�vide Construction Engineering Services as requested by the City. We will perform site <br />observations throughout the duration of the project. The number of inspections and involvement during <br />construction �i�l vary depending on the experience level of the selected contractor and condition of the <br />chiller vessel. <br />If the chiller vessel shell is found to be corroded we will assist the City in selecting a materials testing firm <br />to the level of corrosion and thickness of the steel wall. The cost of the material testing will be paid for by <br />the City. <br />We will also perform contract administrationtasks such as shop drawing review of all materials and <br />equipment, processing pay requests and change orders and will answer questions irom the contractor. <br />Step 5—�valuate the Option of a Plate and Frame Chiller Type System <br />If this option is selected the evaluation will be performed between Steps 2 and 3 listed above. <br />During this step we will: <br />■ Evaluate the feasibility of installing a plate and frame type chiller system in place of reconditioning the <br />existing shell and tube condenser type system. <br />Write a letter report including and discussing the following: <br />� A description of the plate and irame system that would best fit the existing refrigeration <br />system including space needs and code related issues. <br />f1 Discuss the feasibility of separating the single refrigeration system into two separate <br />systems to create redundancy in the system. <br />�� A comparison of the existing shell and tube chiller design to a plate and irame chiller <br />system including efficiency, capital costs, life expectancy, operational and maintenance <br />costs and any other advantages and disadvantages for each system. <br />Reviewthe findingswith the City. <br />If the City approves this type of system in place of renovating the existing shell and tube chiller system <br />we will provide the City with a revised design proposal to include this change. <br />�Ir. Lonnie Br�kke� Director of Parks and Recreation <br />January 26,2005 Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.