Step 6— �valuafe the �eas�}�i?ity of Connecting the RSVC Arena to the John Rose Oval's <br />Refrigeration System. <br />If this option is selected the evaluation will be performed between Steps 2 and 3 listed above. <br />Duringthis step we will: <br />■ Evatuate the feasibility of connecting the RSVC ice rink floor to the John Rose Oval's refrigeration <br />system. <br />■ Write a letter report including and discussing the following: <br />�ti A general description of the finro facilities (RSVC Arena and the Oval) and the refrigeration <br />demand requirements includingevaluating the existing refrigeration capacity of each <br />facilitiesand the required refrigerationcapacity if the two facilities are combined. <br />:� Evaluation of physical obstacles such as the distance between the Oval's refrigeration <br />system and the RSVC Arena and its effect on system efficiency and construction costs. <br />; Evaluation of seasonal demands on the common refrigeration system including <br />determining if the Oval's large refrigeration system can adequately and efficiently serve a <br />single ice sheet application during the summer months. <br />,-� Estimate of probable construction costs for the piping connection between the Oval's <br />refrigeration system and the RSVC Arena and all required modificationsto the Oval's <br />refriger�lior� systemto accommodatethis addition. <br />: Evaluation of the existing direct refrigeration system package currently serving the RSVC <br />Arena and recommendations for improvements or replacement options including <br />improvementsto the existing package system, replacement with a like system, and <br />replacement with an indirect system. Estimates of probable construction costs for all of <br />the options discussed will be provided, This information will allowthe City to evaluate all <br />of the options for renovating the RSVC ice rink floor and equipment. <br />�:; Estimate of probable construction costs for the ice rink floor replacement in the RSVC <br />Arena with a like direct system design and an indirect system design. <br />� Reviewthe findings and cost estimateswith the City. <br />' If the option of serving the two facilities with a common refrigeration system is determined feasible and <br />the City approves this option we will provide the City with a revised design proposal to include this <br />change based on the determined scope of the project. If the City approves other recommended <br />improvements to the RSVC Arena we will provide the City with a revised design proposal based on the <br />scope of the project�sj. <br />Mr. Lonnie Brold�e. Director of Parks and Recreation <br />January 26,2005 Page 5 of 7 <br />