Laserfiche WebLink
• County Road B2/Wells Fargo/Northwest Mall Entrance <br />4 <br />Optimized cycle lengths, splits and offsets <br />* County Road S2/Rosedale Commons <br />6 <br />Optimized cycle lengths, splits and offsets <br />. County Road �21American StreetlNorth Mall Entrance <br />a <br />Optimized cycle lengths, splits and offsets <br />4 <br />Additional 170 foot southbound turn lane <br />Lengthen to 300 feet westbound le#� turn lane <br />• County Road B2/Sout6bound TH 51 RamplNorthwest mall Entrance <br />a Optimized cycle lengths, splits and offsets <br />4 <br />Eastbound left turn set as coordinated phase <br />4 <br />Add 75 feet to southbound left turn lane <br />4 <br />Lengthen to 340 feet eastbound left turn lane <br />4 Ros�dal� perimeter road transition to full left turn lane, full through lane, and a <br />400 foot right turn lane <br />County Road B21Northbound TH 51 Ramp <br />4 <br />Optimized cycle lengths, splits and offsets <br />MnDOT and Metro Transit continue to analyze a number of locations for the �ark-and- <br />ride and transit center functions and a slip-ramp froin east bound County Road B2 on to <br />the southbound Snelling Avenuelwest bound Trunk Highway 36 ramp for Minneapolis <br />bound busses and cars. Metro Transit has indicated a willingness to assist in some <br />financing. Although informally supported by MnDOT staff, at this time it is unclear <br />whether MnDOT will a�provelallow the Snelling Avenue off ramp (at County Road B2) <br />improvement on the exit ramp. Further, both Ramsey County and MnDOT understand <br />the importance of identifying (through traffic studies like that completed by Parsons) <br />future regional transportation needs in the Rosedale Center area, however, neither will <br />commit to programming or funding the improvements identified in the report. <br />Rasedale Traffc Improvement Plan Cost <br />Estimate <br />(March 7,2005: �osedale Traffic Improvement Plan) <br />Signal Construction 60,000 <br />Signal Design 22,000 <br />Signal Ti m� i7 �� 44,000 <br />Signal Sub-total 126,000 <br />Roadway Construction 118,000 <br />Roadway Design 49,000 <br />PF3608_RGA_�inalDeveloptnent_050905 Page 7 of 13 <br />