Laserfiche WebLink
On June 14, 2005 at 2:00 p.m. bids were received and read aloud in the Council <br />Chambers, three bids were received as follows: <br />BID TABULATION (see bid description below) <br />Contractor Base Bid Alt #� Alt #2 Alt #3 Alt #4 Alt #5 Alt Total <br />#7 Alt <br />New Mech 1) $388,900 $8500 $18000 $6800 $24,835 $1 � 0 $59,635 <br />� <br />2)$55001per <br />3) $0.69Iper <br />' � I <br />Harris � 1) $245,000 $10,000 �3[�[]� �1�7,�0� �25,�4�� $1200 -5[�� �48,��0 <br />� Mechanical � <br />2)$1100/per <br />3)$0.981per <br />I � �'R •• <br />�: Cool Air -�.; 1}$298,800 $3400 ��&�� ��;}�[] NONE <br />d � Mechanical� <br />- .�--.�..F-' • 2)$28001per <br />3)$1,'16(per <br />� <br />Base Bid: <br />1. Lump sum for the re-tube of the chiller barrel <br />$2800 � ����� ���,�[]U <br />exc. #4 <br />2. Replacement of disk inserts and pins in the existing check valves (5) <br />3. 24% Calcium Chloride/Brine Solution (per gallon mixed solution) <br />Alternate #'1- Start up services <br />Alternate #2- Two-year warranty <br />Alternate #3- Chiller support system <br />Alternate #4- Removal and disposal of existing brine <br />Alternate #5- Paint high pressure receiver <br />Alternate #7- Replace brine pumps <br />� <br />