My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0126_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0126_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 8:42:32 AM
Creation date
12/14/2009 1:39:44 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dennis Welsch <br />January 12,2004 <br />Page 4 <br />Workshon #8: Develonment Pro�ram and Land i�e Alternatives and Concent Plan <br />Workshop #8 wi11 include a review of alternative Land Use Scenario Diagrams wi11 be prepared in <br />consultation with the Development Team. This workshop wi11 be focused on a detailed discussion of the <br />problems, opportunities and other implications of each of the scenarios. The workshop date and <br />information to be covered in the workshop are outlined in the attached work program flowchart. After the <br />workshop, a meeting wi11 be conducted with City Staff to identify key issues to be explored further, to <br />reach agreement on meeting notes, and to prepare a summary memo to the City Manager. A meeting wi11 <br />also be conducted between DSU and the DevelopmentTeam to gather additional input. <br />Workshon #9: Svnthesis. Onuortunities and Constraints Summarv. Alternatives Analvsis <br />Workshop #9 wi11 provide a graphic summary of the input obtained at a11 previous workshops. We wi11 <br />present review and illustrate the likes and dislikes of panel member regarding each scenario. The <br />DevelopmentTeam wi11 participate in this discussion. The objective of this workshop is to move as close <br />as possible toward selecting the preferred alternative. The workshop date and information to be covered <br />in the workshop are outlined in the attached work program flowchart. After the workshop, a meeting wi11 <br />be conducted with City Staff to identify key issues to be explored further, to reach agreement on meeting <br />notes, and to prepare a summary memo to the City Manager. A meeting wi11 also be conducted between <br />DSU and the DevelopmentTeam to gather additional input. <br />Workshon �14: Concent Plan <br />Workshop #10 wi11 present a discussion draft concept plan that reflects the input received during the <br />discussion on the alternatives in previous workshops. This exhibit wi11 illustrate land use areas, roadway <br />alignments, open space,landscaped areas, and other pertinent features. It wi11 intentionally be produced in <br />a graphic format that is less detailed than a typical PUD concept p1an. The Advisory Pane1 and <br />Development Team wi11 have a free-flowing discussion of a11 aspects of the concept diagram. The <br />workshop wi11 also introduce issues to be addressed through Design Standards, Mitigation Strategies, and <br />Implementation Too1s. The workshop date and information to be covered in the workshop are outlined in <br />the attached work program flowchart. After the workshop, a meeting wi11 be conducted with City Staff to <br />identify key issues to be explored further, to reach agreement on meeting notes, and to prepare a summary <br />memo to the City Manager. <br />Workshon #11; Revised Concent Plan. Su��ested Desisn and Performance Standards, Wrap TJ� <br />Workshop #11 wi11 include a presentation of a refined Concept P1an that was revised based on feedback <br />from Workshop �41 �, There wi11 be a presentation of the types of suggested design and performance <br />standards to address issues and concerns. The workshop wi11 conclude with a review of the process and a <br />presentation of the process for the next steps, and opportunities for continued participation in the PUD <br />review and approval process. The workshop date and information to be covered in the workshop are <br />outlined in the attached work program flowchart. After the workshop, a meeting wi11 be conducted with <br />City Staff to identify key issues to be explored further, to reach agreement on meeting notes, and to <br />prepare a summary memo to the City Manager. <br />
The URL can be used to link to this page
Your browser does not support the video tag.