My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0524_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0524_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 12:11:58 PM
Creation date
12/14/2009 1:41:26 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed construction <br />Alternate l: Bituminous Trail Proposal <br />� Between Rice Street and Lexington Avenue construct an 8 foot wide bituminous pathway <br />on the north side of the road. <br />0 8 foot bituminous (or concrete) trail on north side of the street. <br />0 5 foot grass strip between road and trail. <br />o Two way facility. <br />o Pull the pathway away from the street at Central Park Elementary school and <br />connect to the Central Park pathway connection. <br />o On street parking would not be impacted. <br />o No additional right- of- way required. <br />o Estimated Construction Cost = $570,000 ($970,000) <br />Alternate 2: Bituminous Trail Lexington to Walnut <br />� Do not construct any facility in the right- of- way between Rice Street and Lexington <br />Avenue. <br />From properiy owner feedback this would be their preferred alternate. <br />. This proposal would need to be reviewed and approved by the Metropolitan Council <br />Transportation Advisory Board (TAB) for conformance with the original grant <br />application. Upon review, the TAB may choose to eliminate a portion or all of the <br />Federal Funding. <br />Alternate 3: ConcretelBituminous Trail Proposal <br />. Between Rice Street and Lexington Avenue construct a sidewalk on both sides of the <br />street. <br />0 5-6 foot concrete sidewalk on both sides of the street. <br />0 5 foot grass strip between road and sidewalk. <br />o Each facilitywould be one way. <br />o Pull the pathway away from the street at Central Park Elementary school and <br />connect to the Central Park pathway connection. <br />o On street parking would not be impacted. <br />o No additional right- of- way required. <br />o Estimated Construction Cost = $1,600,000 <br />County Road B-2 Trail <br />Feasibility Report <br />May 24,2004 <br />�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.