Laserfiche WebLink
5.12 The "General Concept Plan" has established setbacics as follows: A front yard (south) <br />setbacic of 98 feet fi-om the property line adj acent to Larpenteur Avenue; a rear yard <br />(north) setbacic of 30 feet from the property line adjacent to Dionne Street; a east side <br />yard setbacic of 14 feet ; and a west side yard setbacic of 16 feet. The building wall along <br />both side yards has numerous j ogs and the setbacic along these property lines are <br />minimum distances. <br />5.13 Access to the site will be from Larpenteur Avenue. However a small 11 stall parlcing lot <br />is proposed with access from Dionne Street. Residents and visitors will enter the site <br />from Larpenteur Avenue and proceed to either on-site parlcing within a court yard setting, <br />the drop-off circle, or to the underground parlcing garages. The Phase 1 underground <br />parlcing access is tuciced bacic within the court yard area, while the Phase 2 underground <br />parlcing access is immediatelywest of the site access from LarpenteurAvenue (see site <br />plan). The plan must include proof of parl�ng where additional surface parl�ng <br />spaces can be made available within the site. <br />514 The existing parcel is relatively flat. Site grading will be completed to increase the grade <br />for and/or around the senior cooperative and town homes. The height of the 3-story <br />senior cooperative is estimated at 40 feet to the mid point of the top of the pealc of the <br />roof. The roof feature at the front entry has a height of 42 feet. <br />5.15 The senior cooperative will include building materials consistent with the City Code <br />including stone, durable cement fiber board lap siding, shalces and trim, aluminum or <br />vinyl windows and doors. Decics will be provided for a number of the units, but no all <br />units. <br />516 The developer proposes that the senior cooperative parcel be rezoned to Planned <br />Unit Development (PUD) with an underlying zoning of R-3, General Residence <br />Distric� <br />OTHER IMPROVEMENTS: <br />5.17 The proposed development seelcs to retain an existing greenhouse on the premises and <br />incorporate it into the proj ect, as part of the recreation/amenity of the site. This structure <br />will require updating to meet current building and fire code standards, for which <br />structural engineering to determine stability will be necessary. As an alternative, the <br />developer may raze and replace the structure with a new greenhouse. The developer <br />hopes to incorporate elements of the existing Leben's building into the new greenhouse. <br />A reuse plan will be required at the "Final Development Plan" phase that details the <br />specific improvements and use. <br />5.18 The proposed grading plan is currentlybeing reviewed by the Capital Regions Watershed <br />District and the Roseville Public Works Department. Storm water management practices <br />must be implemented for this redevelopment proj ect to control the rate of storm flow <br />discharge and eliminate a high percentage of phosphorous. <br />PF3548 — RCA 052404 Page 4 of 13 <br />