My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0726_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0726_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 3:34:23 PM
Creation date
12/14/2009 1:43:14 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Add to bondo cell doors that were dented during shipping. This work will be billed to <br />Kendell. Add $ 516 <br />Add for Kellington to remove, load, unload and reinstall doors 127A and 137A. These doors <br />had to be fixed by Kendell. This will be a backcharge to Kendell. Add $1,041 <br />Bondo screw holes on hollow metal frames. There was a total of 19 hours to complete this <br />work Add $1,599 <br />During demolition, in several areas where the vinyl base was removed, the paper on the <br />sheetrock was tom up the wall. These areas had to be patched by Olympic Drywall prior to <br />painting. The cost for Olympic to do this work is a charge to Kellington. (Deduct $1,081) <br />Add for Kellington to cut out masonry in the PW building in order for the new steel infil] <br />joists to be installed. These cut-outswere never identified on the drawings. Add $572 <br />Charge for Kendell to purchase 4 additional cylinders for doors #124A, #168A, #188A and <br />#189A that were shipped to the site and lost. (Deduct $233) <br />Charge for Kendell to replace miscellaneous hardware for doors # 141 A and # 1131 A that vu� <br />shippedto the site and lost. (Deduct $666) <br />Charge for Kendell to travel to the j obsite and fix several items that were installed incorrectly <br />by Kellington. Charge is for travel time and replacement pieces purchased by Kendell. <br />(Deduct $821) <br />Add to sawcut, remove and excavate a 6' x 6' hole in the slab-on-grade for the new footing <br />and column in the basement at the stairway (Grids 3.8 & G). This demolition work was <br />never identified on the demolition plans. This e�ra also included removing some precast <br />plank and topping at the stair opening. Add $5,055 <br />M.G. McGrath Add $2,492 <br />Add to furnish additional material and fabrication on the metal panels on the sides of the <br />window j ambs at the South side bump-outs. This information is addressed in PR #21. Add $ <br />2,492 <br />Olympic Wall 5*st� Inc. Add $ 22,208 <br />Change soffit elevations and soffit detail at the linear diffuser as shown on Detail8/A3.5 in <br />ASI #21. The added veneer plaster shown on ASI #21 was removed. ($4,218 -$842 = <br />$3,376). Add $3,376 <br />Add a two (2) hour rated soffit and ceiling, as well as a 36" x 36" rated, access panel as <br />shown in ASI #21 Revision # 1. Add $2,309 <br />Add to relocate door frame # 153 . The frame had already been set and the wall was drywalled <br />prior to the release of ASI #22. Add $291 <br />
The URL can be used to link to this page
Your browser does not support the video tag.