Laserfiche WebLink
Deduct to delete veneer plaster at the high lobby walls as called out in PR #34, There was <br />approximately 800 square feet deleted. (Deduct $1,200) <br />Credit to provide metal stud spacing at 24" on-center in lieu of 16" on-center as called out in <br />the specifications. (Deduct $2,100) <br />Remove and replace moldy drywall and rigid insulation on the exteriorwalls in the lower <br />level. Add $2,417 <br />Add for numerous drywall changes and additions in the lower level remodel area per PR #52, <br />This work is required due to mold under existing sheetrock because of window leaks. Add $ <br />7,322 <br />Add to remove anchors and patch drywall where the furniture had been fastened to the <br />sheetrockwalls. Add $1,561 <br />Add to repair the sheetrock that had been tom due to the base being ripped off of the wall by <br />the demolition contractor. See the Olympic letter dated June 15,2004. This will be a <br />backcharge to Kellington Construction. Add $1,081 <br />Add z-furring and 1-1/2" rigid insulation and 5/8" drywall over 6 mil poly, tape and finishthe <br />drywall. This change was approved by the owner prior to startingthis work Add $4,933 <br />Add to fix the drywall window returns at the PW building due to the fact that the window <br />gaskets did not get installed before cold weather. This will be a backcharge to Harmon. Add <br />$550 <br />Add to build a soffit at Corridor L131 where the acoustic ceiling hits the new stairway. This <br />soffit also needed an access door for a unit heater. Add $1,668 <br />Northern Air Corn. Add �22.763 <br />Add finned-tube radiation and a 16" x 16" transfer duct as called out in PR #29. See PR #29 <br />for the cost breakdown. Add $3,812 <br />Add to install a new floor drain in Room 1125 as called out in PR #39. A floor drain was <br />required since the sprinkler system equipment is located in this room. Add $2,550 <br />Add to increase the natural gas service pressure into the existing building as called out in PR <br />#41. This change forcedNAC to install a differenttype of gas regulator. Add $1,846 <br />Add numerous transfer duct grills in the new public safety building as called out in PR #45 , <br />Add $4,666 <br />Add to furnish and install a 3/4" water line to the old generator that was relocated in the new <br />PW building. This water line was required for cooling of the generator. Add $1,526 <br />Add to �urnish and install hard pipe ductwork to 12 VAV's in the lower level remodeling <br />area as called out in PR #51. The add to re-hang these VAV's has been rejected by the <br />owner. Add $3,313 <br />