My WebLink
|
Help
|
About
|
Sign Out
Home
2004_0726_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_0726_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 3:34:23 PM
Creation date
12/14/2009 1:43:14 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The worship center, lobby expansion and new restroom footprintbeing limited to <br />8,302 square feet. The basement must be used for storage. <br />3. Rea1 Life Church andlor its design consultant revising the site plan specifically <br />related to the parking lot to address one of the suggested parking lot design <br />modifications identified in the City's traffic consultant letter dated July 15,2004. <br />4. New signage being reviewed separately and issued proper sign permits. <br />5. The worship center, lobby expansion, and new restroom addition being comprised <br />of brick, integral colored rock faced block, metal trim, and metal or aluminum <br />window and door frames that blend/complement the existingbuilding, or concrete <br />pre-cast panels, architecturally designed to blend/compliment the existing <br />building. <br />6. The sewer and water utilities, grading, sidewalks, paving and driveway access, <br />and storm water drainage plans for the site being reviewed and approved by the <br />Grass Lake Water Management Organization and the Roseville Public Warks <br />Department. <br />7. The worship center being limited to a maximum height of 35 feet from grade. <br />8. The landscape plan, screening plan for the parking lot from residences, and <br />paxking lot lighting plan, meeting City Code Section 1010, and prepared by a <br />registered landscape architect, being reviewed and approved by the city landscape <br />architect. <br />9. All HVAC, power generation, andtrash storage equipmentbeing screenedto meet <br />the requirements of City Code Section 1010. <br />10. There shall be no paving or parking on the south side parking area (18 stalls) of <br />the Church site. <br />The motion for the adoption of the foregoing resolution was duly seconded by Council <br />Member , and upon vote being taken thereon, the following voted in favor: <br />andthe followingvoted against: <br />WHEREUPON said resolution was declared duly passed and adopted. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.