My WebLink
|
Help
|
About
|
Sign Out
Home
2004_1025_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2004
>
2004_1025_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 4:22:20 PM
Creation date
12/14/2009 1:45:43 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule: If approved, staff will schedule neighborhood meetings for the 2005 work during <br />November. The feasibility reports will be presented to the Council in early January. Public <br />hearings could be held in late January or early February. <br />Staff Recommendation: The following street reconstruction is recommended for 2005. <br />[�ei h b�rh�o�d ���-e�et <br />Rcconssruct»i� <br />19/22 <br />From <br />To <br />3200 West RR <br />S. Owasso Boulevard Rice Street Crossing_ <br />�� Chatsworth Street Grandview Lovell <br />Lovell Ave atswort cul- de- sac <br />Total <br />�t�mat�d <br />��n�trU ��i�� <br />�o�t <br />1,000,000 <br />150,000 <br />1,150,000 <br />It is proposed that the cost of the project be financed with MSA funds, infrastructure funds and <br />special assessments. <br />RECOMMENDED COUNCIL ACTION: Adoption of a resolution authorizing the <br />preparation of feasibility studies for the reconstruction of South Owasso Blvd, Rice Street to <br />railroad crossing; Chatsworth Street, from Grandview Avenue to Lovell Avenue; and Lovell <br />Avenue, from Chatsworth Street west to the cul-de-sac. <br />Prepared By: Debra Bloom <br />
The URL can be used to link to this page
Your browser does not support the video tag.