My WebLink
|
Help
|
About
|
Sign Out
Home
2009-08-31_Minutes
Roseville
>
Commissions, Watershed District and HRA
>
Housing Redevelopment Authority
>
Minutes
>
2009
>
2009-08-31_Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2010 11:55:36 AM
Creation date
3/18/2010 11:55:34 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Housing Redevelopment Authority
Commission/Committee - Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HRA Meeting <br />Minutes – Monday, July 27, 2009 <br />Page 4 <br />Further discussion included marketing of “cottage” or “villa” type housing; with Mr. Mullins noting <br />that this type of active adult senior cottage had been very successful and affordable development (i.e., <br />Maplewood, MN); providing slab on grade construction, with more income guidelines and more modest <br />price points. Mr. Mullins noted that this type of development was seen more in new developments and <br />was usually for higher end homes (i.e., Woodbury) offering one-level living with a walkout basement <br />for 55+ buyers with steeper price points. <br />Additional discussion was limited indications related to “10-40’s” or homes built after World War II, <br />usually grouped in blocks; and any potential for removing a block or two of this type of home; <br />increasing popularity of land banking property in MN, especially as communities sought to remove <br />“problem” properties within their community, while recognizing the challenges in property acquisition <br />for most communities. <br />Discussion ensued regarding upcoming programs specific to dilapidated properties through the Family <br />Housing Fund; the City’s current inventory of vacant land and specific product types well-suited to that <br />vacant land. <br />Mr. Mullins noted that their study indicated thirty-eight (38) plus vacant parcels in Roseville, excluding <br />the Twin Lakes Redevelopment Area, and confirmed by the City’s Comprehensive Plan Update, and <br />that some land assembly would be required, but depended on how strong land use was for a particular <br />property. Mr. Mullins cautioned that consideration be given to zoning districts and property types, with <br />mixed use concepts providing the most flexibility. <br />Further discussion included development or redevelopment or those parcels easier to develop, leaving <br />more challenging or infill lots, with a broad range of opinion and ultimate design concepts for those <br />parcels; parcels remaining (i.e., Hamline Shopping Center, Fairview Community Center, across the <br />street from City Hall, and other obvious parcels). <br />Mr. Trudgeon advised that this report would assist the HRA and staff focus on future housing potential, <br />with the City Council and HRA needing to determine, from a policy discussion standpoint, whether <br />they desired to be involved in promoting that future housing potential; with staff looking through the <br />lens provided by this study as development came forward. <br />Additional discussion included opportunities versus available resources, and prices for current land <br />inventory based on timing of economic recovery. <br />Member Pust thanked Mr. Mullins for the study providing affordability information, and that it <br />wouldn’t happen without some sort of public role. <br />Concluding discussion included how long the study would remain relevant, or if and when it should be <br />updated, with Mr. Mullins noting that most communities updated their housing studies every five (5) <br />years, and opined that given the current housing market, he didn’t see the need for the City of Roseville <br />to update this study any sooner than that. Mr. Mullins noted that, typically, a private developer would <br />perform similar housing studies as part of their due diligence for a potential project. <br />Ms. Kelsey noted that those studies would be project-specific for any new market-rate development <br />coming forward. Ms. Kelsey further noted that there was not a lot of luxury rental unit competition in <br />Roseville for potential developers, other than for the Lexington Apartments. <br />Member Pust opined that this housing study was hugely valuable information; and recommended that <br />the HRA build into their budget funding for an update every five (5) years; and suggested that timing <br />appeared to be critical, and suggested that the HRA determine how to have developers provide the City <br />with their respective market studies. <br />Chair Maschka and members thanked Mr. Mullins for his presentation. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.