My WebLink
|
Help
|
About
|
Sign Out
Home
2009-05-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2009
>
2009-05-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 3:02:38 PM
Creation date
3/23/2010 2:29:59 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/26/2009
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RICE STREET/HIGHWAY 36 INTERCHANGE STl1DY <br />~~Ell'SLETTER.ISSUE: <br />~i~~~' ~nnt; <br />What is the preferred alternative? <br />The preferred alternative proposes <br />reconstruction of the existing diamond <br />interchange at Highway 36 and Rice Street to <br />an offset single point diamond interchange. <br />The existing bridge over Highway 36 will <br />be replaced with three bridges far the new <br />interchange, <br />This alternative also includes improvements <br />to the Rice Street corridor between CR B and <br />CR 62. This includes approximately 3,900 <br />feet of Rice Street being reconstructed from a <br />three-lane section to a four-lane section with <br />right- and left-turn lanes at major intersections, <br />sidewalk, on-street bike access, signals, and <br />street lighting. Stormwater and drainage <br />improvements also are included to achieve <br />watershed standards. <br />Why was this alternative celected? <br />Uased on the detailed traffic analysis and open <br />house input, the Project Management Team (PMTI <br />selected the offset single point as the preferred <br />alternative to be carried forward for further review. <br />This alternative was selected because it: <br />• Provides the best long-term traffic <br />operations and improves intersection <br />spacing <br />Does the best job of accommodating <br />bicycles and pedestrians by providing <br />standard geometry and signalized <br />protection for all crossings <br />• Allows far maintaining traffic during <br />construction <br />Is most compatible with plans for <br />future park-and-ride alternatives along <br />Rice Street south of TH 36 <br />~JNNES~S^ ~ / <br />~~ ~ ^~® IGmley-Fbm <br />Pro ~ert Partners: = ,~- ^ d~~ ~ ~~ <br />~ _~~,,,,~~ ;~_•,i.~-'~`~'~~:°i'. ~~~.711~I7~~ ~ andA~sodates,lnc. <br />~:.~>~ <br /> <br />i <br />-- _- <br />
The URL can be used to link to this page
Your browser does not support the video tag.