My WebLink
|
Help
|
About
|
Sign Out
Home
2010-02-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2010
>
2010-02-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2010 4:06:14 PM
Creation date
3/23/2010 3:21:17 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
2/23/2010
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Avenue widen the existing roadway to a maximum width of 42 feet. The proposed <br />improvements include the reconstruction of Minnesota Avenue to a two-lane urban <br />section with dedicated turn lanes at the Rice Street intersection. The proposed pavement <br />section for the roadway includes 7-inches of bituminous pavement over 6.5-inches of <br />aggregate base. The proposed roadway width will be 47 feet at the Rice Street <br />intersection and will taper back to 34 feet to match the existing roadway. Driveways <br />disturbed by construction will be replaced in kind within the public right-of--way with the <br />exception of the driveway to the apartment building on the southwest corner of the <br />intersection with Rice Street, which will be closed. <br />County Road B2 West <br />County Road B2 West will be reconstructed approximately 500 feet east of Rice Street <br />and 500 feet west of Rice Street in order to tie back into the existing roadway section. <br />The total length of the proposed street reconstruction is approximately 1,000 feet. <br />County Road B2 West is currently a 34 to 42 foot wide two-lane urban section roadway <br />with bituminous pavement and concrete curb and gutter. Existing turn lanes along <br />Minnesota Avenue widen the existing roadway to a maximum width of 52 feet. The <br />proposed improvements include the reconstruction of County Road B2 West to a two- <br />lane urban section with dedicated turn lanes at the Rice Street intersection. The proposed <br />pavement section for the roadway includes 7-inches of bituminous pavement over 10.5- <br />inches of aggregate base. The proposed roadway width will be 54 feet at the Rice Street <br />intersection and will taper back to 34 to 42 feet to match the existing roadway. <br />Driveways disturbed by construction will be replaced in kind within the public right-of- <br />way with the exception of the driveway to the Wonder Bakery on the north side of <br />County Road B2 which will be removed. <br />B. Storm Sewer Improvements <br />The existing storm sewer system on Rice Street primarily conveys runoff from the project <br />area to the existing drainage basin located in the southwest quadrant of the TH 36/Rice <br />Street interchange. The proposed storm sewer improvements will maintain the existing <br />drainage patterns. <br />The proposed storm sewer improvements will include replacement of existing catch <br />basins and storm sewer piping and the addition of a trunk storm sewer line along Rice <br />Street. Proposed catch basins will be located based on Mn/DOT State Aid standards and <br />storm sewer pipes will be sized fora 10-year storm event. <br />C. Sanitary Sewer Improvements <br />There are limited sanitary sewer improvements within the project area. All sanitary sewer <br />manhole castings will be adjusted as needed along segments of Rice Street, County Road <br />B West, Minnesota Avenue, and County Road B2 West that are being reconstructed. A <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.