My WebLink
|
Help
|
About
|
Sign Out
Home
1995-01-26_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
199x
>
1995
>
1995-01-26_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2010 3:56:10 PM
Creation date
4/12/2010 3:01:51 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/26/1995
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-2 The Board reviewed the following letters sent by the GLWMO since the last <br />meeting: <br />1. Letter to Bruce Wilson of MPCA requesting a review of the proposed direction <br />of the GLWMO lake .planning project. <br />2. Letters to Ed Burrell, City of Roseville, and Terry Schwerin, City of Shoreview <br />regarding the proposed. 1995 GLWMO budget. <br />3. Letter from Don Meyer to XP Software expressing concern about delays <br />.experienced by SEH in the preparation of the SWMM model update. <br />4. Letter to Mark Lobermeier, SEH, letter authorizing lake planning services. <br />C-3 Keel gave an update on the Ramsey County Capital Improvement Program: <br />Construction Pror~ram, :1994-1999 <br />1. County Road F, Lexington Avenue to Victoria Street-1994 street <br />reconstruction <br />2. County Road C, Hamline Avenue to Little Canada Road-1996, street. <br />restriping and signal modifications <br />Road Maintenance Program, 1994 <br />L Gramsie Road, Victoria Street to Rice Street-This project was cancelled when <br />Shoreview reconstructed the roadway in 1994. <br />2. North Owasso Boulevard, Victoria Street to Rice .Street-recycle. <br />C-4 Board reviewed the drainage maps. from the Roseville. and Shoreview stormwater <br />- management plans. <br />D. REPORTS <br />D- l Mark Lobermeier, engineering consultant, summarized the information contained in <br />the quarterly consultant report. The following items were discussed: <br />1. SWMIvi Model Calibration/Model Verification. <br />Lobermeier reported that the SWMM Model results have finally been completed. <br />Based on he completed model, the following generalizations could be made: <br />Pollutant loadings are higher than previously predicted.' <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.