My WebLink
|
Help
|
About
|
Sign Out
Home
1996-07-25_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
199x
>
1996
>
1996-07-25_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2010 4:22:15 PM
Creation date
4/12/2010 4:05:01 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
7/25/1996
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LlIY UI- 12UStv1LLt Fax:b12-490-22(5 JU1 1( "yb 14:11 t'.U1/US <br />July 17, 1996 <br />To: Grass Lake Water Management Organization Board <br />from: Karl P. Keel, Roseville Director of Public Works <br />Re: Staff reports on pending matters <br />New developments/projects within Roseville affecting the GLWMO: <br />a. School district redevelopment-Owasso/Western/Da1e <br />The primary work activity is the construction of new homes. Of primary concern is erosion <br />control on each building site. Special care has been given to ensure that the developer <br />sweeps streets periodically to minimize the amount of sediment entering the new storm <br />sewer system. <br />b. Kehler Development-County Road C/Dale Street <br />This development consists of the construction of two short public cul-de-sacs to serve new <br />townhomes on the southwest corner of County Road C and Date Street. Major grading has <br />been completed, and two new N>;TfZP stonnwater basins have been constructed to address <br />both water quality and water quantity issues. rt is expected that roadway construction will <br />be completed by late August 1996, and the townhome units will be constructed by spring <br />1997. <br />c. ,Acorn Park re~radi~ <br />As part of Roseville's park improvement program, a large portion of Acorn Park will be <br />redeveloped. 'This project began in 1945 and is expected to be completed by late fall 1996. <br />The contractor has been required to implement erosion control as necessary. <br />d. Outlet to Bennett Lake <br />Construction. has begun on the new outlet to Bennett Lake. This outlet, constructed from <br />the east side of ;aennett Lake across Vct;oria Street to the American Legion ponds, is <br />intended to replace the existing pumping system. This project wiIl allow Bennett Lake to <br />drain without operating the existing pumps. This modification will. have a positive impact <br />on water quality, since the stormwater will not be churned by a pumping system. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.