My WebLink
|
Help
|
About
|
Sign Out
Home
2002-04-18_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
200x
>
2002
>
2002-04-18_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2010 11:56:50 AM
Creation date
4/14/2010 3:27:53 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/18/2002
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roger Lake discussed the need to move forward in a timely manner on the start of this contract. There <br />is an urgency to complete the Battle Creek Channel Cleanout site work (Site 13) during winter in order <br />to prevent drainage problems in the lower ravine and to minimize inconvenience for park users. If the <br />project were re-bid, Brad Lindaman estimated a three to four week delay in'project start, and the <br />substantial and final completion dates would both need to be extended accordingly. <br />Paul Ellefson expressed the importance of preserving our bidding process in order to maintain credibility <br />and fairness to our bidding contractors. <br />3. DISCUSSION AND APPROVAL OF MOTION <br />Motion: Jack Frost moved, seconded by Bob Johnson, that the conditional award of the bid to Jay Bros., <br />Inc., be revoked. It is noted that the apparent lowest bidder, Jay Bros., Inc., failed to complete all line <br />items of the bid. It is further noted that four out of five bid. applicants failed to provide the required <br />sworn statement. Due to the irregularities and to avoid any appearance of unfairness, the Ramsey- <br />Washington Metro Watershed District rejects all bids for the 2002 CIB Maintenance and Repair Project <br />and authorizes the project to be re-bid. The motion carried unanimously. <br />Questions followed on how the rebidding process would proceed. Brad stated that all changes will be <br />reflected in an addendum to be sent to all current planholders. The new bid advertisement will be placed <br />in the January 25 Construction Bulletin, and the bids will be opened on February 6. <br />4. ADJOURNMENT <br />Motion: Bob Johnson moved, seconded by Pam Skinner, to adjourn the meeting. The motion carried, <br />and. the meeting was adjourned at 7:12 p.m. <br />Respectfully submitted: <br />Robert Johnson, Secretary <br />Page 2 January 22, 2002 Special Meeting RWMWD Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.