My WebLink
|
Help
|
About
|
Sign Out
Home
2002-10-24_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
200x
>
2002
>
2002-10-24_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2010 12:01:21 PM
Creation date
4/14/2010 4:09:16 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/24/2002
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
seconded the amended motion, and the motion carried with 4 ayes (Johnson, Skinner, Ellefson, and Frost) <br />and one nay (Lake). <br />Permit 02-38: Willow Lake Business Park 2nd Addition - Vadnais Heights <br />The wetland onsite is currently classified as Protect. A site visit was made to verify the classification.. <br />Staff determined that the Protect wetland classification was not appropriate. Instead, a Manage 2 category <br />was determined by staff to be the appropriate classification, with an associated 25-foot buffer requirement. <br />The applicant has requested a variance to allow a 15-foot buffer. It was agreed that site restrictions <br />presented a significant hardship due to existing roadways and setback requirements. <br />Motion: Jack Frost moved, Paul Ellefson seconded, to approve Permit #02-38 and the associated wetland <br />buffer variance. Motion carried. <br />Permit 02-39; Wyndham Ponds, Phase I -Woodburv <br />This development contains 114 single-family homes and 197 townhomes. Two of the six wetlands onsite <br />are exempt from WCA requirements. Proposed wetland impacts include: 730 square feet to build a berm, <br />and 2,418 square feet to construct a roadway. Sequencing arguments and the mitigation plan have been <br />submitted, and all mitigation is proposed to be on-site at a 2:1 ratio. <br />Tina distributed Hedlund Engineering's memo dated 8/5/02, which explains their request for a variance <br />from the 50-foot buffer requirement on a Manage 1 wetland in order to accommodate a trail system on the <br />northerly, easterly, and southwesterly edges. This basin will be used for stormwater treatment and will also <br />alleviate flooding problems associated with the adjacent Villa Piazzre development (Permit #01-34). <br />Motion: Paul Ellefson moved., Bob Johnson seconded, to approve Permit #02-39 and the associated <br />wetland exemption and wetland buffer variance. Motion carried. <br />Permit 02-40; New Life Academy High School - WoodburX <br />In order to receive this permit, the applicant must also comply with the terms of an earlier WCA Wetland <br />Replacement Plan that requires the submission of a monitoring report for the wetland that was created as <br />part of Permit #96-27. <br />Motion: Roger Lake moved, Paul Ellefson seconded, to approve Permit #02-40 and the associated WCA <br />reporting requirements related to the site. Motion carried. <br />Permit 02-41: Snyder Drug, Market Place -Little Canada <br />Stormwater will be treated in a new stormwater pond to be completed as part of the City of Little Canada's <br />2002 street improvements project (Permit #02-26). This pond will treat the water from this site before it <br />enters Round Lake. <br />Motion: Paul Ellefson moved, Bob Johnson seconded, to approve Permit #02-41. Motion carried. <br />Permit 02-42; Battle Creek Lake Area Flood Protection -Woodburv <br />The District's CIB project will create a 450-foot long berm above the ordinary high water level of the lake <br />to protect two remaining homes that were not purchased by the City of Woodbury. <br />Motion: Roger Lake moved, Bob Johnson seconded, to approve Permit #02-42. Motion. carried. <br />Permit 02-43: Culver's Frozen Custard - St. Paul <br />A temporary grading permit was issued for this project. <br />Motion: Paul Ellefson moved, Bob Johnson seconded, to approve Permit #02-43. Motion carried. <br />Page 2 August 7, 2002 RWMWD Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.