My WebLink
|
Help
|
About
|
Sign Out
Home
2007-01-25_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
200x
>
2007
>
2007-01-25_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2010 1:36:50 PM
Creation date
4/16/2010 12:23:41 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/25/2007
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 6, lJsing the lake m®del, assess likelih®® ®f beneficial use <br />attainment under ulti ate watershed land use c®nditi®ns <br />Expected Cost: $3,050 <br />The calibrated P8 and in-lake models will be used to estimate phosphorus loads and lake <br />phosphorus concentrations assuming ultimate watershed land use conditions. Runoff and <br />lake water quality during wet, dry, and average precipitation conditions will be evaluated <br />to better represent the full range of possible climatic conditions. The estimated im-lake <br />conditions will be used to determine the future attainability of the established beneficial <br />use goals. <br />Task 7: E?ec®mmend feasible alternative remedial measures <br />Expected Cost: $5,040 <br />If in-lake water quality modeling results suggest that water quality goals will not be <br />attained under ultimate watershed land use conditions, the water quality model will be <br />used to predict the benefits of implementing watershed or in-lake BMPs on Lake Owasso <br />water quality. BMP alternatives will be selected based on several factors, including <br />characterization of the in-lake phosphorus budget (the contribution of watershed versus <br />internal phosphorus loads), hydrologic considerations (stormwater rate and/or volume <br />reduction), availability of land for BMP implementation, and soil characteristics at <br />potential BMP sites. It is expected that imacrophyte management may play a role in the <br />recommendations for this lake. If t11is is the case, Barr will include general aquatic <br />macrophyte management recommendations as part of the BMP analysis. <br />Once the BMPs have been analyzed, planning-level cost estimates will be prepared to <br />help determine the cost effectiveness of identified BMPs. Individual BMPs will be <br />prioritized based on overall cost-effectiveness, and a phased implementation plan will be <br />developed. <br />Task Prepare a anagemenf Alternatives ep®rt ®n the Lake <br />wass® iagn®stic®Feasibility Study, with Stakeh®Ider <br />lnv®lvement <br />Expected Cost: $'i 6,870 <br />Creating a Mana};ement Alternatives Report on the Lake Owasso Diagnostic-Feasibility <br />Study will involve generating drafts that describe the work conducted through the UAA <br />process, the UAA results, maps, discussion of management alternatives and concept-level <br />recommendations of remedial measures for the lake. After incorporating the WMO's <br />feedback on the initial draft report, it will be presented at a public meeting in order to <br />obtain feedback. A revised final report will then be generated for presentation at a <br />subsequent public meeting. <br />P:\wr\13\prp\2006\6069 -Lake Owasso\Lake_Owasso_UAA_Scope_Final_Jan 12 07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.