<br />Project Update <br />The utility replacement work on Farrington Circle <br />and Farrington Avenue is complete. The <br />Contractor, Astech, will be starting the pavement <br />rehabilitation work after Memorial Day. What <br />follows is a schedule of when work will start on your <br />street. Please be aware that these schedules are <br />weather dependent, rain can cause delays. <br />Week of May 31st: <br />• Farrington Cir (Transit Ave to Cul-de-sac) <br />• Farrington Ave (S Owasso Blvd. to Millwood Ave) <br />• Kent St (Iona Lane to Woodhill Dr) <br />• Mackubin St (Iona Lane to W. County Road C) <br />• Millwood St (Western Ave to Farrington Ave) <br />• Virginia Cir (Transit Ave to Cul-de-sac) <br />• Woodhill Dr (Kent St to Western Ave) <br />Week of June 7th: <br />• Laurie Rd (Fernwood Ave to Lexington Ave <br />• Sandhurst Dr (Fernwood Ave to Lexington Ave <br />• Sherren St (Fernwood Ave to Lexington Ave <br />• Brenner Ave (Cleveland Ave to Evelyn St) <br />• Evelyn St (W. County Road D to Brenner Ave) <br />• Mount Ridge Rd (W. Co Rd D to Brenner Ave) <br />Week of June 21st: <br />• Brenner Court (Old Highway 8 to Cul-de-sac) <br />• Cleveland/ TH36 Svc Dr (W. Co Rd B2 to W. <br />Perimeter Dr) <br />• County Road C2 (Cleveland Ave to Cul- de- sac) <br />• County Road C2 (Lincoln Ave to Snelling) <br />• Lincoln Dr (Lydia Ave to Terrace Dr) <br />Once the pavement has been milled, the contractor <br />will begin removing the curb designated for repair. <br />Sprinkler systems and invisible dog fences near <br />curb repairs will be affected and should be removed <br />out of the right-of-way until the curb has been <br />replaced. When the curb is replaced the streets will <br />be paved. Once work has started on a street <br />segment, it should be completed within 3 weeks. <br />2010 Contract B <br />Street Maintenance <br />Please comply with the No Parking signs as they <br />are placed. No Parking signs will be enforced on <br />weekdays. Parking on weekends is allowed. <br />Sprinkler Systems/ Invisible Fence <br />Please notify Darren Lindsey, Project Coordinator, <br />if you have an underground sprinkler system, <br />invisible fence, or other pipe in the boulevard. The <br />Contractor will not be able to protect these systems <br />if they are unaware of their existence. If these <br />systems are not marked and are damaged, the City <br />will not make repairs. <br />.~"~ <br />~~ ~~ ~~~ <br />Questions? <br />As this project progresses, we will keep you <br />informed through direct mailing and by updating <br />information on the project webpage. If you have <br />any questions, concerns, or comments please <br />contact us at 651-792-7003 between 8 am and 4:30 <br />pm. <br />Project Contacts: <br />Darren Lindsey, Project Coordinator <br />(651) 792-7045 <br />Darren.lindsey@ci.roseville.mn.us <br />Debra Bloom, City Engineer <br />(651) 792-7042 <br />deb.bloom(a~ci.roseville.mn.us <br />Check for construction updates at: www.cityofroseville.com/2010ContractB <br />Pavement Rehabilitation <br />