Access <br />Contractors are required to keep the roads <br />passable and provide driveway access whenever <br />possible. The construction project will be staged so <br />that residents and emergency vehicles will be able <br />to drive on the streets at all times. If you have <br />special access needs, please let us know. <br />Mail Delivery & Garbage Pick up <br />The construction work should not impact your mail <br />delivery or garbage pick up. Schedules and times <br />should remain unchanged. Please contact us if you <br />have problems as a result of this construction. <br />Survey Markers <br />In order to perform the project construction, <br />Engineers place a series of survey markers for the <br />Contractor to measure from. Typically these <br />markers are offset several feet from the object or <br />point they refer to so that they are not disturbed <br />during the construction process. As a result, these <br />offset markers are often placed well into resident's <br />yard. Please notify Darren Lindsey, Project <br />Coordinator, of any stakes that have been moved <br />inadvertently. <br />Utility Flags <br />To protect against underground utility damage, the <br />Contractor will be calling in utility locates. This is <br />required by anyone digging a hole whether it is for <br />planting a tree or removing curb. Xcel Energy, <br />Comcast and Qwest will locate their underground <br />utilities by spray painting and placing flags in the <br />boulevard. <br />Project Summary <br />This project is a part of the City of Roseville's <br />ongoing street maintenance program. Streets <br />which have curb and gutter but have a poor driving <br />surface are improved using a mill and overlay <br />process. This process usually consists of grinding <br />all or a portion of the existing surface off the <br />roadway and replacing it with a new blacktop <br />driving surface. As part of the process, sunken or <br />badly deteriorated curb and gutter will be replaced. <br />The following streets are included in this year's <br />construction contract: <br />Segment 1: Municipal State Aid Mill & Overlay <br />• Cleveland/ TH36 Svc Dr (W. Co Rd B2 to W. <br />Perimeter Dr) <br />• County Road C2 (Lincoln Ave to Snelling) <br />• Lincoln Dr (Lydia Ave to Terrace Dr) <br />Segment 2: Roseville Street Mill & Overlay: <br />• Brenner Ave (Cleveland Ave to Evelyn St) <br />• Brenner Court (Old Highway 8 to Cul-de-sac) <br />• County Road C2 (Cleveland Ave to Cul- de- sac) <br />• Evelyn St (W. County Road D to Brenner Ave) <br />• Farrington Cir (Transit Ave to Cul-de-sac) <br />• Farrington Ave (S Owasso Blvd. to Millwood Ave) <br />• Kent St (Iona Lane to Woodhill Dr) <br />• Laurie Rd (Fernwood Ave to Lexington Ave <br />• Mackubin St (Iona Lane to W. County Road C) <br />• Millwood St (Western Ave to Farrington Ave) <br />• Mount Ridge Rd (W. Co Rd D to Brenner Ave) <br />• Sandhurst Dr (Fernwood Ave to Lexington Ave <br />• Sherren St (Fernwood Ave to Lexington Ave <br />• Virginia Cir (Transit Ave to Cul-de-sac) <br />• Woodhill Dr (Kent St to Western Ave) <br />There will be no assessments levied to property <br />owners to complete mill and overlay work. The <br />cost to perform this pavement maintenance is <br />funded by existing City funds. <br />Check for construction updates at: www.cityofroseville.com/2010ContractB <br />