My WebLink
|
Help
|
About
|
Sign Out
Home
res_5316
Roseville
>
City Council
>
City Council Resolutions
>
05xxx
>
5300
>
res_5316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:07:32 AM
Creation date
4/23/2005 4:53:59 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
5316
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />NOTICE OF HEARING <br />ON STORr.' SEWER AND STHEET IHPROVmmNT <br />ST-P-69-17 OF THE <br />VILLAGE OF ROSEVILLE <br /> <br />NOTICE IS HEREUY GIVEN that the Council of the Village of Roseville, fvlinnesota, will meet <br />in the Community Room of Rosedale Center, Nest lIigh\'lay 36 and Fairview Avenue North, on <br />the 5th day of ~1arch, 1970, at 7:30 o'clock p.m., to hold a public hearinp: pursuant to <br />Minnesota Statues, Olapter 429. as amended, on proposed Storm Sewer and Street Improvement <br />ST-P-69..17 consisting of construction on Oxford Street between "Old" County Road C and <br />"New" County Road C. <br /> <br />Street construction would consist of the p:rading of Oxford Street, together wi th the con- <br />struction of concrete curb and gutter alonp, both sides of the roadway throughout its entire <br />length followed by the installation of sub-base and a 2 inch plant-mixed bituminous sur- <br />faCing. The width between curbs face to face \"ould be 32 feet. <br /> <br />Also included as part of the street construction is the construction of approximately 60 <br />feet of stonn sewers and necessary manholes and catch basins, which are necessary to pro- <br />vide proper drainage for the street. <br /> <br />The entire foregoing proposed constnlction would complete proposed improvements ST-P-69-l7 <br />along present ly partially platted but unimproved Oxford Street, between "Old" County Road C <br />and "New" County Road C. The foregoing is all substantially in accordance with a pre.. <br />liminary engineering report which is now on file and open to public inspection in the office <br />of the Village Manager. <br /> <br />TIle cost of the improvement is presently estimated at approximately $15,760.00. TIle area <br />proposed to be assessed for the improvement includes all properties encompassed in the <br />foll owing: <br /> <br />Commencing at the soutln"est corner of the Southwest Quarter (SI\' 1/4), Southwest Quarter <br />(SWl/4) of the Southwest Quarter (SW 1/4), Section 2. Township 29. Ranpe 23, thence <br />east along the south line of said Section 1484.73 feet i thence north at right angles <br />730 feet, more or less, to the center line of County Road "C" thence westerly along <br />said center line 1471.2 feet, more or less, to the west section line of Section 2, <br />Township 29, Range 23, thence south along said west section line 749.8 feet to point <br />of beginning. <br /> <br />All persons desiring to be heard with reference to the improvement and the area proposed <br />to be assessed therefor may appear and be heard by the Village Council at the time and <br />place stated above. <br /> <br />Dated: February 16, 1970 <br /> <br />BY ORDER OF THE VILLAGE <br /> <br />~~ <br /> <br />Vi Uage Manager <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.