My WebLink
|
Help
|
About
|
Sign Out
Home
res_5408
Roseville
>
City Council
>
City Council Resolutions
>
05xxx
>
5400
>
res_5408
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:07:40 AM
Creation date
4/23/2005 4:56:25 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
5408
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Roseville and Arden Hills. Said points are designated on Exhibit <br /> <br />"2" which is attached hereto and made a part hereof. The maximum <br /> <br />allowable rate of discharge at each connection is also designated <br /> <br />on Exhibit "2" and Arden Hills shall not allow the discharge to be <br /> <br />beyond those designated in Exhibit "2". <br /> <br />In the event the Village Council of Roseville determines <br /> <br />that it is probable Arden Hills will exceed or is exceeding the maximum <br /> <br />rates set forth on Exhibit" 2", which determination by the Council <br /> <br />shall be based upon competent engineering advice to that effect, <br /> <br />Roseville may require Arden Hills to construct detention basins in <br /> <br />Arden Hills for the purpose of reducing the flow of sewage into Roseville <br /> <br />to the limits set forth in Exhibit" 2". In such event Arden Hills <br /> <br />shall construct such basins within nine months of passage of a resolution <br /> <br />to that effect by the Roseville Council, which basins shall be paid <br /> <br />for and maintained at the sole expense of Arden Hills. The provisions <br /> <br />of this paragraph, however, shall be subject to the provisions in <br /> <br />Exhibit "1", particularly on page 10 of said Exhibit "1" I and Arden <br /> <br />Hills shall not be required to construct said basins without the approvals <br /> <br />and authorizations required therein. <br /> <br />5. <br /> <br />The Roseville Public Works Director or any other <br /> <br />employee designated by the Village Council of Roseville shall upon <br /> <br />reasonable notice, be permitted to inspect the Arden Hills sanitary <br />, <br /> <br />sewer system and its operation. Arden Hills shall be given the same <br /> <br />reasonable rights of inspection of the Roseville sanitary sewer system. <br /> <br />6. <br /> <br />Arden Hills shall submit to Roseville within thirty <br /> <br />(30) days after January 1st of each year, the statement of the number <br />
The URL can be used to link to this page
Your browser does not support the video tag.