Laserfiche WebLink
3. 1�Iinnesota Department of Natural Resources (correspondence dated 1�Iarch 7, 2001) <br />CONIN�NTS: <br />• The DNR commends the proj ect proposer for using infiltration areas. <br />• A DNR public waters permit will be required for any work in a DNR pond below the <br />Ordinary High Water level of 903.5' <br />• Landscaping should be placed around the pa�ed trail to lessen the impact of freeway <br />noise on trail users. <br />RESPONSE: <br />The project proposer has no intention of working in a DNR pond below the Ordinary <br />High Water level. <br />• Landscaping adjacent to Interstate 35W was installed during Phase 1 improvements. <br />The Landscaping adjacent to I-3 5 W was installed in the Interstate right of way and was <br />approved by NINDOT. This Landscaping will create a buffer and lesson the impacts of <br />freeway noise on trail users. <br />4. 1�Iinnesota Pollution Control Agency (correspondence dated 1�Iarch 7, 2001) <br />COMMENTS <br />• A sanitary sewer permit is required if flows substantially increase. <br />• NPDES requirements will need to be met as part of this project <br />• The Indirect Source Permit (ISP) will require certain roadway improvements to be <br />completed and open to traffic before a certificate of occupancy is issued by the City of <br />Roseville. <br />RESPONSE: <br />• The City of Roseville is currently reviewing the Business Park sewer system. Upon the <br />completion of their study, a permit will be obtained from the NIl'CA if improvements <br />are warranted. <br />• The project does not anticipate changing drainage patterns or the rate of runoff from <br />those calculated during the 1997 design and construction of the Regional Pond by the <br />City of Roseville. The Pond design and construction is consistent with the requirements <br />outlined in the NPDESBest Management Practices. The Pond design addressed the <br />requirements for wet-detention volume and settling velocity. All necessary storm water <br />permits have been previously obtained for this project and will be re-evaluated prior to <br />construction to determine if new permits are warranted. <br />6 <br />\\Victoria\CommDev\Planning Fi,les\3283 Ryan Co_Veritas\RCA (032601).doc <br />