My WebLink
|
Help
|
About
|
Sign Out
Home
2001_0611_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2001
>
2001_0611_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 3:18:17 PM
Creation date
10/25/2010 1:37:27 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Contract Documents. Roseville shall prepare all construction contract <br />documents and they shall be approved by the Roseville attorney. <br />E. Construction Supervision. Each City shall have its own <br />administer the scheduling of field work, occurring within <br />boundaries, as described in the contract documents and <br />efforts wherever possible to ensure that the construction <br />Projects proceeds in an efficient manner. <br />contact person to <br />its corporate <br />shall coordinate <br />of the Combined <br />F. Chan e Orders. During the course of construction, each City may request <br />change orders for the portion of the Combined Projects located within its <br />corporate boundaries. Change orders shall be submitted and approved <br />pursuant to the terms of the construction documents. <br />G. Allocation of Proiect Costs. The costs of the Combined Projects sha11 be <br />apportioned in the following manner: <br />1. Owasso Boulevard West Reconstruction Proiect. Prior to the <br />award of contract, the Cities shall allocate the total amount of the <br />construction cost. Generally, Shoreview shall be responsible for the <br />cost of the project constructed in Shoreview and Roseville shall be <br />responsible for the cost of the project constructed in Roseville. <br />2. Storm Water Ponding Proiect. The Storm Water Ponding Project <br />consists of the construction or improvement of a common pond and <br />the construction or improvement of a pond located in Roseville. <br />Shoreview shall pay 80% of the cost of the common pond <br />improvements and Roseville shall pay 20% of such costs. Roseville <br />sha11 pay 100% of the costs of the Roseville pond. <br />3. Chanpe Orders. Each City shall be responsible for the cost of any <br />change order which it initiates or approves. <br />4. Administration/Engi�eerin� Fee. Shoreview shall pay Roseville <br />an administrative/engineering fee in the amount of 4% of that <br />portion of the total construction contract which applies to <br />improvements constructed within Shoreview. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.