Laserfiche WebLink
POST E LECTION M ODE <br />REVIEW SUPERVISOR FUNCTIONS <br />2 S Additional On-site Pre-election Training, <br />Testing, Site Surveys; maximum 7 days <br />(Nlunicipalities Staff & Polling Locations <br />- June/July/August, 2002) <br />2 <br />(Dorothy <br />Includes review and <br />identification of the data transmission site in <br />each polling location or best alternative site, <br />performing modem testing from the polling <br />location and final testing of the transmission <br />of election results. <br />$500/day <br />0 Poll Worker Training, Poll Worker Manual, $500/day <br />Open/Close Instructions <br />In accordance with the training outline <br />shown below. <br />(Municipalities Staff, Election <br />Judges - August, 2002) <br />Need to pull language from the email on poll worker training) <br />I On-site Election Day Coverage per Contract <br />Coverage for 2002 Countywide elections <br />12,500 <br />$10,000 <br />10,000 10,000 <br />Elections JPA 15 of 25� <br />