My WebLink
|
Help
|
About
|
Sign Out
Home
2001_1022_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2001
>
2001_1022_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 2:24:08 PM
Creation date
10/25/2010 1:38:55 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Requestfor Amendment to PUD <br />Solutia-Roseville <br />August 6, 2001 <br />Page 3 of 7 <br />PROPROSED PUD AMENDMENT <br />Pro osed Buildout of Centre Pointe Status S uare Foota e <br />C.P.B.P. Phase 2 Buildin A& B Built 101,886 <br />Ehlers and Associates Built 13,425 <br />Veritas software Built 62,420 <br />C.P.B.P. Phase 1 Buildin A& B Built 25,445 <br />Builders Association Built 15,120 <br />Office Buildin Built 12,015 <br />Fairf'ield Hotel Built 37,013 <br />Residence Hotel Built 75,391 <br />Courtyard by Maniott Hotel Under 71,028 <br />Construction <br />Veritas Building 1 Under 143,157 <br />Construction <br />Veritas Buildin 2 Pro osed 120,000 <br />Veritas buildin 3 Pro osed 120,000 <br />Pro osed Solutia Consultin Pro osed 21240 <br />Total S.F. ro osed 818 140 S.F. <br />Total S.F. ermitted b 2001 PiJD 802 900 S.F. <br />PROJECT DESCRIPTION <br />The Solutia Consulting development will consist of a 21,240 S.F. building situated on the lot <br />to capture views of the Minneapolis skyline and in close pro�mity to the e�sting pond on <br />the property. The building will be two stories and include an underground parking garage. <br />The building will be the new headquarters for Solutia Consulting. The project would both <br />meet and exceed the existing PUD development standards by utilizing a superior building <br />design and building materials as well as incorporating a high-quality site design that takes <br />advantage of the parcel's distinctive amenities. The site has been designed to locate the <br />proposed building near the southern property line, offering views of the pond areas south of <br />the building and of the Minneapolis Skyline. The proposed building will be similar in <br />materials to the building currently constructed at Centre Pointe, thus creating a cohesive <br />image for the Business Park. Landscaped green areas are provided around the buildings <br />providing a naturalistic setting. <br />Architecturally the project consists of a two-story office building with a 10,620 S.F. floor <br />plate for a total of 2 1,240 S.F. of gross building area and a lower level garage for 24 cars. <br />The floor to floor height is 12'-8" on the first level with an overall parapet height of 3 1'-0". <br />The rooftop mechanical systems are entirely enclosed within the parapet screen wa11. <br />The e�terior image of the building reflects the style of its primaty tenant Solutia Consulting. <br />The design is a contemporary classic look predominantly brick and glass with accents of <br />precast panel and efis. The massing of the e�terior wa11s is broken up by the change in <br />materials to give the building a sense of human proportion and scale. The front face of the <br />building has a prominent entry canopy that directs visitors to the main lobby area this allows <br />the signage to be placed off center and to remain understated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.