My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0408_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0408_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 9:30:15 AM
Creation date
10/25/2010 1:46:26 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tII. DEFINITIONS <br />1. General <br />d) Assessment Rate <br />The assessment rate for any special assessment district is <br />computed by dividing the total assessable costs of such <br />improvement by the total number of assessment units, such as <br />dividing the total cost of a water lateral proj ect by the total <br />adj usted front footage of property benefited by that proj ect. <br />b) Assessable Costs <br />The assessable cost of an improvement shall be defined as those <br />costs which in the opinion of the City Council are attributable to <br />the need for service in the area served by the improvement. <br />Assessments shall be based on estimated costs. All f00tdg25 are <br />• computed to the nearest hundredth of a foot. Areas are computed <br />and recorded to the nearest square foot, or 1/100th of an acre. <br />C) Petition <br />Petition shall mean a written document presented to the City <br />Council for purposes of initiating a public improvement proj ect. <br />All signatures shall be accompanied by the address of each <br />signator, the date of the signature and a printing of each <br />signator's name. An example of the usual form of petition <br />is included in the Appendix. <br />d) Total Project Cost <br />Total proj ect cost shall mean the final construction cost plus all <br />associated overhead costs. Overhead costs shall include but not <br />be limited to city administration, engineering, legal, fiscal, <br />- i interest during construction and land dCQUlS1t10i1. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.