Laserfiche WebLink
� <br />e <br />"� 2. Reconstruction Projects <br />a. CO(T�T1el'[la 1/Industrial Rates <br />Comnercial/industrial property abutting a Mu�1C1pdI <br />State-Aid reconstruction project will be assessed all <br />costs associated with reconstructing the existing street <br />to the City standard for COmileT'C1d1J1t1duStT'ldl areas, <br />The incremental cost between the cost assessed and the <br />total project cost may be funded with Municipal $tdte— <br />Aid construction funds. <br />b. Residential Rates <br />Residential property abutting a Municipal State-Aid <br />reconstruction project will be assessed all costs <br />: � associated with reconstructing the existing street up t0 <br />the City standard for a residential area. The <br />incremental cost between the cost assessed and a tOtdl <br />proj ect cost may be funded with Municipal State-Aid <br />Construction Funds. <br />f) Appurtenances <br />Appurtenances such as sidewalks, street lighting, trees or other <br />landscaping features are often encountered during street improvement <br />proj ects. Appurtenances to new street construction, street <br />reconstruction or bituminous overlay improvements which are either <br />existing or needed by the City shall be included in the cost of the <br />street improvement project, <br />L <br />L- <br />36 <br />