My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0408_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0408_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 9:30:15 AM
Creation date
10/25/2010 1:46:26 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installation cost of a water meter. The current charges are <br />,,,� provided in the Appendix. Neither of these .Chd�qe5 may be <br />assessed against the property. <br />g) Water Main Lateral Benefits <br />The benefit resulting to a property abutting or utilizing a water <br />main where a direct connection to that water main via a building <br />service is reasonably possible without additional lateral pipes. <br />Lateral benefit may be provided by connection to trunk, subtrunk <br />or lateral pipes. The calculation of lateral benefit from a trunk <br />or subtrunk pipe will be based on the cost of an 8 inch pipe along <br />the same alignment for CO(tl��Cld� or industrial zoned property and <br />a 6 inch pipe for all other areas. <br />� h) Infrastructure Rehabilitation Projects <br />Any project or portion of a proj ect which reconstructs an existing <br />water system facility. A rehabilitation proj ect may occur on the <br />existing alignment of the water line or on a new alignment thus, <br />allowing the existing line to be abandoned or its status <br />downgraded (i.e., trunk or subtrUnk to lateral). <br />2. Determining Water Main Assessment Rates <br />"� al Trunk, Subtrunk. Stora�e and Treatment Facility Rates <br />Any lateral and building service assessments described below will <br />be deducted from the total improvement cost to be assessed. The <br />remaining costs shall be spread equally-to all properties which <br />lie within the approved Service District, The costs shall be <br />spread on a gross area basis and will be known as all or any of <br />the following as appropriate: trunk, subtrunk, source, storage and - <br />�� � treatment assessment. i..� <br />2 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.