My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0610_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0610_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 3:14:05 PM
Creation date
10/25/2010 1:47:30 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5 <br />2.0 <br />2.1 <br />✓ On May 29� the junk and debris were removed <br />o Weeds exceed 8" in height. <br />✓ On May 27th the weeds were cut <br />o The pylon sign is in need of repair. <br />✓ On May 27� the pylon sign was removed along with the gas <br />pumps. <br />o The wooden soffit is missing sections. <br />The Property Manager has met with City staff and has indicated his intentions to <br />complete all of the repairs by July 1��. <br />STAFF RECOMMENDATION <br />Staff recommends that the Council approve abatement of identified City Code violations <br />with costs not to exceed 125% of estimates. <br />2.2 Staff further recommends actions toward repair not be commenced until after <br />July 10, 2001, in order for the property owner to perform the repair and avoid <br />abatement. Any listed conditions still in violation on July 10, 2002 will be abated by the <br />City and assessed to the property. <br />3.0 SUGGESTED COUNCIL ACTION <br />3.1 By resolution, authorize the Community Development Director to abate those City Code <br />violations identified in this report which are still in violation as of July 10, 2002, <br />including: <br />a) <br />b) <br />c) <br />d) <br />e) <br />fl <br />g) <br />h) <br />Secure two doors <br />Repair structure (peeling paint) <br />Repair wooden soffit (missing) <br />Replace plastic light panels <br />Remove cabinet and other debris <br />Reposition pole sign wording <br />Install panels on gas pumps <br />Administration of abatement process (10%) <br />Total <br />completed by owner <br />$2,000.00 <br />750.00 <br />2,500.00 <br />completed by owner <br />completed by owner <br />completed by owner <br />525.00 <br />$5,775.00 <br />The above costs are estimates (the price quote obtained was not broken down). <br />Charges are to be assessed to the property and payment on taxes per City Code 407.06 — <br />407.07. A final report will be submitted to the City Council upon completion of all work. <br />cc: Property Owner <br />City Attorney <br />\\Victoria\CommDevAAbatements\RCA-Hearing 2'j�j¢ j,exingtOn_�61��i.dOC <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.