My WebLink
|
Help
|
About
|
Sign Out
Home
res_6782
Roseville
>
City Council
>
City Council Resolutions
>
06xxx
>
6700
>
res_6782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:11:32 AM
Creation date
4/25/2005 11:58:56 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
6782
Resolution Title
Ordering the Construction of Improvement No. ST-P-78-30 Under and Pursuant to Minnesota Statutes, Chapter 429 and Ordering Preparation of Plans and Specifications
Resolution Date Passed
2/12/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l8 <br /> <br />MR. MANGLE: The water running down these people's driveway <br />goes this way and the water here will go that way. <br /> <br />MR. HONCHELL: This is what our preliminary investigation <br />indicates is that that's the way the water is draining and being <br />picked up. <br /> <br />MAYOR DEMOS: The hearing is closed. <br /> <br />COUNCILMAN ANDERSON: I'd like to ask a question about those <br />lots. You say they have a storm sewer now? <br /> <br />MR. HONCHELL: The BanCon lots to the east of Dale and south <br />of that line, yes, they have a system. <br /> <br />COUNCILMAN ANDERSON: Were they assessed? <br /> <br />MR. HONCHELL: I believe that was put in by the developer. <br /> <br />COUNCILMAN ANDERSON: Like the people on the west of Dale. <br /> <br />COUNCILMAN KEHR: Would there be any disturbance of Terrace <br />Street or Lane putting in that sewer - putting in the catch basins - <br />would Terrace Drive be disturbed in any way? <br /> <br />MR. HONCHELL: Only at the location where the catch basins <br />are and the outlets. In the case of Terrace only where the two <br />catch basins would be located and the crossing across the street <br />between the two. Iona Lane to the west of Dale Street would be <br />somewhat the same, namely there would be a pair of catch basins <br />west of the intersection, a line crossing the street to (inaudible) <br />them and out to the middle of the intersection. <br /> <br />COUNCILMAN KEHR: There would be a minimal amount of dis- <br />turbance of Terrace. <br /> <br />MR. HONCHELL: That's right. <br /> <br />COUNCILMAN KEHR: You indicated that the dotted line that you <br />have according to your preliminary studiesfuat you have done, <br />that these are the areas that are contributing to the flow of water <br />into that proposed storm sewer, is that correct? <br /> <br />MR. HONCHELL: That's correct. <br /> <br />COUNCILMAN KEHR: Was that done to the topo through the <br />elevations that you have on your site plans? <br /> <br />MR. HONCHELL: It was done by general observation in the field <br />by our survey staff. There was not a complete topo done because we <br />did not wish to go to that expense until we felt the project <br />would be constructed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.