hub. It also serves as a remote facility for the Minnesota State Fair and major events at <br />the John Rose Oval". <br />6.3 Metro Transit has 8 years remaining on their existing "exclusive use agreement" with <br />Rosedale Center. Metro Transit does not have a permanent easement; the agreement can <br />be bought out by Rosedale for $130,000 at any time. <br />6.4 The Development Review Committee (DRC) has indicated a need for the transit hub and <br />park-and-ride lot to be incorporated into this proposal and Jones Lang LaSalle, through <br />their consultant Parsons, has been working with Metro Transit to incorporate these two <br />auxiliary uses. The current plan has been revised to reduce a queuing or stacking problem <br />for Metro Transit that adds too much time to bus routing. Buses will be stacked on the <br />southeast corner of the theatre, then routing to the main entry area and back through the <br />parking lot. For transit to be properly addressed, the location of bus staging area and/or <br />the travel lane to get there will have to be studied in more detail. <br />TRAFFIC: <br />6.5 Development Review Committee (DRC) has reviewed the parking and traffic proposal <br />and provided the applicant with a number of comments. The DRC initial concern is on- <br />site parking, movement of traffic on the site, and pedestrian access to the malL The DRC <br />requested the applicant to perform an all-encomuassinQ traffic studX (by Parsons <br />Transportation Group) that would be reviewed by the City's traffic consultant (SEH). <br />6.6 The traffic report (Rosedale Center Mall Expansion Traffic Impact Study) reviewed four <br />different scenarios. First, Parsons analyzed the 2006 & 2025 '7�T� Build" scenario, which <br />establishes a baseline for what the background traffic would be on these roads if the <br />expansion did not happen. Second, Parsons took a look at the 2006 & 2025 "Build" <br />scenaria This demonstrates the impacts to the system from the proposed expansion. <br />6.7 The Parsons report performs a"level of service" analysis for each of the seven <br />intersections surrounding the mall on County Road B-2 and Fairview. SEH has indicated <br />a concern over mitigation measures being proposed that may not adequately address all of <br />the operational issues that appear when the additional traffic is introduced onto the <br />surrounding public street system. <br />6.8 The Parsons report presents a discussion of the average "level of service" for each <br />intersection and bases their recommendations on that data. This average "level of <br />service" treats each intersection as though it stands alone, not tied into an integrated <br />signal system as is the case for these County Roads. Additional analysis of intersection <br />queuing or stacking reveals that traffic from one intersection can cause operational <br />difficulties at the next intersection along the road. As a result, additional short-term and <br />long-term mitigation measures should be considered. <br />6.9 Fairview and County Road B-2 are County Roads. Trunk Highway 36 and Snelling <br />Avenue are State Roads. The Rosedale expansion is a land use/zoning and site <br />PF3608_RCA_GeneralConcept_122004 Page 5 of 20 <br />