WMP Section <br />Potential Update <br />2.1 Climate and Precipitation Data <br />Report period of record 1961 —1990. Should update with last 20 years of data and <br />might include some climate change information. <br />2.4.2 Bedrock Geology /Groundwater <br />May need to update this section to reference Ramsey County Groundwater Plan <br />2.5 Land Use and Public Utilities <br />Update current and future land use and reflect any changes in drainage infrastructure. <br />2.6.4 Water Resources Monitoring <br />Information <br />Update figures text with new collected data any new monitoring efforts. <br />Update this section to include water quantity monitoring data and groundwater quality <br />and Quantity data. <br />2.7 Hydrologic System Data <br />Updates possible if outlet structures have been constructed since 2001. <br />2.9 Pollutant Sources <br />Update with any new pollutant sources or sources that have been eliminated. <br />New Water -based Recreation Areas <br />Section not included in current plan, needs to be developed <br />New Fish and Wildlife Habitat <br />Section not included in current plan, needs to be developed <br />New Unique Features& Scenic Areas <br />Section not included in current plan, needs to be developed <br />3.0 Regulatory Framework <br />New regulations (since 2001) need to be added to this section (e.g. NPDES language) <br />3.0 Regulatory Framework <br />Updates to management of County Ditch 19 <br />3.3 Stormwater Management <br />Bennet Lake impairment for Nutrient/Eutrophication Biological Indicators needs to be <br />addressed. Review of Shoreview and Roseville's storm pond maintenance plans and <br />other potential MS4 requirements. <br />Update with new information from FEMA maps. <br />May include identification of potential problem areas and /or infrastructure needs. <br />3.4 Floodplain <br />Table 3 -1 <br />Update with stormwater mgmt. requirements for the Cities of Roseville and Shoreview. <br />4.2 Resource Specific Flooding and <br />Stormwater Runoff Rate Issues <br />Re- evaluate the water level issues being experienced on these water bodies (flooding <br />versus low lake levels during dryer conditions) in light of outlet structures that may have <br />been constructed since 2001 and changes in climate weather <br />4.3.3 mwater Runoff Rates and <br />Volumes Problems and Issues <br />Known stormwater rate and volume issues will be more comprehensively addressed. <br />Grass Lake Water Mgmt Org 3rd Gen 509 Plan <br />fully developed setting. EOR's experience with tax districts, grants, and other funding <br />options will help guide the discussion. Where this meeting falls within the overall plan <br />development process is highlighted on the project timeline. <br />Deliverables: Meeting summary (1) <br />Task 1.4 Presentation to Commissioners Member Community Representatives <br />Description: The EOR team will present the draft Plan to the Board of Commissioners <br />and representatives of the member communities for review and comment before it is <br />approved for distribution for the formal comment period. Key points and highlights of the <br />plan will be presented along with a summary of the public and municipal input received. <br />As stated under Task 2.4, the draft Plan will be revised to reflect the comments and <br />suggestions of the Board during this internal review. Where this meeting falls within the <br />overall plan development process is highlighted on the project timeline. <br />Deliverables: Presentation of Internal Draft Plan at a GLWMO Board meeting <br />Assumptions: The final draft for distribution for the formal comment period will be <br />presented by the selected Planning Process Representative(s), not by EOR, at the Feb. 28 <br />Board meeting. All Board requested changes will have been incorporated in the final draft. <br />Phase 2: Watershed Management Plan Development <br />EOR has reviewed the 2nd Generation Plan and the requirements of 8410 and has identified the sections <br />outlined in the table below as requiring specific updates through this planning process. The developed plan <br />will be based on the input from the Board, the GLWMO Planning Process Representative, and on the <br />technical expertise of the EOR team. <br />Emmons Olivier Resources, Inc. <br />water 1 ecology 1 community <br />5 <br />